BIRMINGHAM CITY
UNIVERSITY
This exciting project involved the relocation and integration of library collection and staff for Birmingham City University from existing campuses to new Curzon Building development.
The relocation of library stock and staff at Birmingham City University aimed to populate the new Curzon building library with existing library collections.
In addition to the main move, internal relocation of collections left within the existing Perry Barr Library was required.
The dismantling and removal of existing shelving was also required.
In total 4,500 linear metres was transferred to the new library with 2,600 linear metres re-oraganised within existing library and 7,000 shelves dismantled and removed.
Full IT de-commissioning, relocation and re-commissioning services provided for the staff moves.